Kjevik Airport
Saved: 2-3 weeks &
NOK 400.000-500.000
Identified the need for reinforcement measures, as well as what level of reinforcement was sufficient.
“We were very satisfied with the site inspection and the results from Birdsview at Kjevik Airport.”

Audrius Dasevicius
Civil Engineer at COWI
Castberg Quarter
Saved: 2 weeks &
NOK 100.000-200.000
The reinforcement bars in the floor of the basement under the Football Pub in the Castberg Quarter were documented and mapped.
“Using Birdsview was a no-brainer. The traditional method would have taken two weeks of chipping and casting – unnecessary work and a lot of extra hassle. With Birdsview, we got a faster, simpler, and far more cost-effective solution.”

Ståle Smaadal
Project Manager at Brødrene Ulveseth
The station
Saved: 3-6 weeks &
NOK 250.000-500.000
The thickness and reinforcement bars in the floors and walls of The Station were documented and mapped. At the same time, the culverts under the floor were surveyed.
“Chiselling up the floor would have caused disruption for the tenant, a lot of noise, and damage to the floor. By using Birdsview, it was possible to minimise destructive interventions and avoid inconvenient shutdowns.”

Kenneth Risøy Lekva
Head of Property Management at GC Rieber
Åna Prison
Saved: 2 weeks &
NOK 100.000-150.000
Mapping of reinforcement in slabs on behalf of Statsbygg, with the aim of reducing risk and extending the service life and function of existing buildings.
It was exciting to scan with Birdsview!

Eivind Stangeland
Chief Engineer at Statsbygg
Lower Haugland
Saved: 1-2 weeks &
NOK 100.000-150.000
For us, it’s pure gold to get the information we need without having to use destructive methods. It saves us time, hassle, and reduces the risks associated with repair work.

Tine Renate Bjerga
Bridge Manager at Rogaland County Municipality
Ogna II
Saved: 2-3 days &
NOK 60.000-80.000
Mapping of the number of post-tensioning cables in the i-beam on the underside of a pedestrian bridge, necessary for performing calculations on the bridge. Uncertainty was associated with the existing drawings.
For us, it’s pure gold to get the information we need without having to use destructive methods. It saves us time, hassle, and reduces the risks associated with repair work.

Tine Renate Bjerga
Bridge Manager at Rogaland County Municipality
Fritt-frem bridge
Saved: 3-6 days &
NOK 250.000-500.000
Slab bridges
Saved: 6-12 weeks &
NOK 1M-5M
Mapping of general reinforcement in the bridge deck for calculating the bridge’s capacity.


“The analyzes provided by the Birdsview Inspect are very accurate. The product gives a precise image of core rot, and the results match well with the impression you get by taking core samples of the pole.”
Richard Ryland


“The solution was surprisingly user-friendly and smooth to work with. It worked really well and we do not see any direct disadvantage with the solution”
Stefan Jostål


“The product is very intuitive. It is easy to learn and easy to use!”
Jon-Martin Kvarme

